Project Overview - Karan Flats III
| Type | Bedroom | Area | Price |
|---|---|---|---|
| Apartments / Flats | 2 BHK | 530 Sq ft | Rs. 20.02 lakhs |
| Apartments / Flats | 2 BHK | 569 Sq ft | Rs. 21.49 lakhs |
| Apartments / Flats | 2 BHK | 697 Sq ft | Rs. 26.33 lakhs |
| Apartments / Flats | 2 BHK | 750 Sq ft | Rs. 28.33 lakhs |
| Apartments / Flats | 3 BHK | 1034 Sq ft | Rs. 39.05 lakhs |
| Apartments / Flats | 3 BHK | 1088 Sq ft | Rs. 41.09 lakhs |
Project Specifications - Karan Flats III
Structure
- Framed structure
- Internal : 4 ½” Thick Brick Wall
- External : 9” Thick Brick Wall
- Internal : Smooth, External : Rough
- Ceramic tiles up to 7’ 0’ Height price up to Rs.25/-
- C.P. Fittings
- Parry ware (White)
- Parry ware (White)
- Teak Wood Frame with flush door, both side Teak finish.
- Teak Wood with MS grilles and Enamel Paint.
- Flush Doors with T.W. Frames Enamel Paint.
- Vitrified Plain Tiles Size 2’0” x 2’0” price up to Rs.42/-
- Granite Platform with stainless steel sink & ceramic tile plain colour cladding for 2’0” above platform.
Electrical
- Concealed Conduits MK brand Switches
Telephone / TV Point
- Provisional
Water
- One heavy duty bore well with the UG sump over head tank of the required capacities to be provided.
Painting
- Internal / External Cement Painting
Car Park
- Covered Car Park
Terrace
- Weathering Course & Clay Tiles.
- Five in one Apartment.
- As per Vastu First preference.
- From 200 Feet just 0.90 KM, Opp. MPL Ford.
- Architecturally Designed Building & Artistic View.
- Very nearer to city 7 KM. away from Airport, 7 KM from Kamatchi Hospital
- Stilt Ground Floor, First Floor and Second Floor Part
- Flooring Vitrified Tiles size 2’0” x 2’0”
- Registration Expenses To be borne by Purchaser, Rs.1 Lakh for 2 BHK & Rs.2 Lakhs for 3 BHK
- Water / Electricity Connection Charges Rs.1,00,000/- for Each Flat
- Covered Car Parking Rs.1,50,000/- Each Extra.
- 100% Clear Title
Project Payment Plan - Karan Flats III
- At the time of Booking - Rs.2,00,000/-
- At the time of signing the Sale / Construction agreement - 20% from total Value within 7 days.
- At the time of Registration UDS Value to be either Purchaser / Financial Institution within 15 days from Sale Agreement.

No comments:
Post a Comment